The significance of monitoring end distribution over three-phase conductors in distributed fault diagnosis of transmission lines

Author: Click:223 Time:2025-01-16

Distribute the monitoring terminal in the three-phase conductor of the overhead transmission line is our Dingsin Intelligent Technology transmission l

Distribute the monitoring terminal in the three-phase conductor of the overhead transmission line is our Dingsin Intelligent Technology transmission line distributed fault diagnosis system monitoring terminal distribution characteristics, and each phase of the conductor each installation of a monitoring terminal, this layout contains a number of important significance for ensuring the safe and stable operation of power lines, the key role in ensuring the safety and stability of operation. This layout contains many important meanings and plays a key role in ensuring the safe and stable operation of transmission lines.

1、Three-phase independent monitoring ;.

The A, B and C phase conductors are mutually independent electrical circuits in the transmission process, and the monitoring terminals installed on each phase of the conductor are capable of independently collecting and analyzing the operating parameters of the line in this phase. When a fault occurs, the fault characteristics of different phases may differ depending on the type of fault (e.g., lightning strike/non-lightning strike, high-resistance/metal ground fault, phase-to-phase short-circuit fault, etc.). By using the monitoring end of each of the three phase conductors, it is possible to ground determine in which phase the fault occurs, thus enabling more fault localization. For example, in a single-phase grounding fault, only the monitoring terminal of the faulty phase will detect typical fault characteristics such as a sudden change in the zero sequence current, and O&M personnel can quickly locate the faulty phase based on this information.



2、Space positioning advantages

Multiple observation points - By installing monitoring ends on all three-phase conductors, fault information can be obtained from different spatial locations, and for some faults that may be caused by differences in spatial location (such as inter-phase short-circuits caused by foreign objects, which may be contacted at different locations on different phase conductors), the data of the three-phase monitoring ends can be synthesized to more accurately Determine the spatial location of the fault point, but also the technical parameters of the transmission line distributed fault diagnostic system of the interval localization reliability of more than 99% of the underlying source.

3. Capturing the difference between different phase faults

Different types of faults in the three-phase conductor will show different electrical characteristics, through the comprehensive analysis of the three-phase monitoring end data, can identify a variety of complex fault types, is an important source of data for fault judgment.

4. Redundant monitoring safeguards

The installation of separate monitoring terminals on each of the three phases of the conductor is equivalent to providing redundant monitoring means. Even if a phase of the monitoring end of the communication failure, sensor damage and other failures, the other two phases of the monitoring end can still work normally, continue to provide part of the data for fault diagnosis, reduce the risk of failure due to a single monitoring end of the failure of the entire fault monitoring system failure.  

5. Data cross-validation ;

Under normal operating conditions, the electrical parameters such as current, voltage and phase of the three phases will satisfy a certain balance relationship. By comparing and analyzing the three-phase data, the accuracy of the data can be verified. When the data is abnormal, through the cross-validation of the three-phase data, it can distinguish whether the data change is caused by the real fault or the error or interference of the monitoring terminal itself, which becomes an important basis for the diagnosis process.



Related recommendations

The online monitoring, distributed fault location and cable online monitoring equipment for power transmission and distribution lines launched by SHENZHEN DINSEE SMART TECHNOLOGY CO.,LTD. has been widely used in Southern Power Grid and State Grid, and has achieved good results.

Record No.: Yue ICP Bei 2022070794-1 | Website Map XML Map

主站蜘蛛池模板: 秋霞鲁丝片av无码少妇| 老司机午夜精品99久久免费 | 亚洲第一天堂无码专区| 色欲久久人妻内射| 大尺度无遮挡激烈床震网站| 成年无码av片在线蜜芽| 亚洲a综合一区二区三区| 欧美成人看片一区二区| 热99re久久精品天堂| 亚洲最大的熟女水蜜桃av网站| 精品乱码一区二区三四五区| 国产免费午夜福利不卡片在线| 亚洲综合久久成人a片红豆| 国产精品亚洲a∨天堂| 久久99精品久久久久久hb亚瑟| 国产精品午夜剧场免费观看| 成人爽a毛片免费视频| 狠狠躁夜夜躁av网站中文字幕| 热99re久久精品天堂| 99久久99久久精品免费观看| 成在线人av无码高潮喷水| 欧美成人精品一区二区综合a片| 国产精品1卡2卡3卡4卡| 秋霞鲁丝片av无码| 天堂√最新版中文在线天堂| 成本人片无码中文字幕免费 | 上司人妻互换hd无码中文| 亚州性无码不卡免费视频| 亚洲综合无码一区二区加勒此| 精品免费一区二区在线| 高清毛茸茸的中国少妇| 国产人在线成免费视频| 亚洲欧洲日产无码中文字幕| 欧洲人免费视频网站在线| 免费女人高潮流视频在线| 午夜福到在线a国产4 视频| 麻豆精品一卡二卡三卡| 大桥久未无码吹潮在线观看| 末发育娇小性色xxxxx| 久久久久久a亚洲欧洲av冫| 国产360激情盗摄全集|